J.Byrne & Son (Aughrim) LTD SEAI Registered Solar Thermal Installer in Tipperary
Contact: Michael O Brien
Grant figures confirmed against SEAI
SEAI-registered J.Byrne & Son (Aughrim) LTD Serving Tipperary and Surrounding Areas
J.Byrne & Son (Aughrim) LTD is an SEAI-registered solar thermal installer based in Tipperary, covering Clonmel, Thurles and homeowners across the county. Registered with SEAI for solar thermal, they can carry out grant-eligible work and process your SEAI grant application directly, so you deal with the installer rather than a middleman.
Based in Tipperary, J.Byrne & Son (Aughrim) LTD serves homeowners across the county including Clonmel, Nenagh, Thurles, Tipperary town, Cahir, Roscrea, Carrick-on-Suir and Templemore. Whether you are in Clonmel, Thurles or anywhere across Tipperary, get in touch to discuss your renewable heating project.
Renewable heating upgrades supported by the SEAI grant scheme are open to homeowners right across Tipperary, whether you are replacing an ageing oil or gas boiler, adding solar, or planning a full home energy upgrade.
Send J.Byrne & Son (Aughrim) LTD an enquiry
Describe your job once. It goes straight to J.Byrne & Son (Aughrim) LTD, an SEAI-registered installer in Tipperary — no lead-selling, no middleman.
J.Byrne & Son (Aughrim) LTD, Common Questions
Is J.Byrne & Son (Aughrim) LTD SEAI-registered?
Yes. J.Byrne & Son (Aughrim) LTD appears on the official SEAI registered contractor database for solar thermal installation in Tipperary, which is what allows them to carry out grant-eligible installations and process your SEAI grant application.
How do I get a quote from J.Byrne & Son (Aughrim) LTD?
Contact J.Byrne & Son (Aughrim) LTD directly using the phone number on this page. Nothing goes through us, there is no booking fee, and your details are not passed to anyone else or sold on.
What areas does J.Byrne & Son (Aughrim) LTD cover?
J.Byrne & Son (Aughrim) LTD is based in Tipperary and takes work across the county, including Clonmel, Nenagh, Thurles, Tipperary town, Cahir, Roscrea, Carrick-on-Suir and Templemore. Most installers cover their whole county rather than one town, so it is worth confirming your own address when you call.
Should anything be done before the installation?
Insulation comes first on any home energy upgrade. A well-sealed house needs a smaller system and runs at a lower cost, and attic and wall insulation carry SEAI grants of their own. Ask about the fabric of the house when you speak to J.Byrne & Son (Aughrim) LTD.
What grant can I claim on work by J.Byrne & Son (Aughrim) LTD?
Because they are on the SEAI register, work carried out by J.Byrne & Son (Aughrim) LTD is grant-eligible. SEAI pays up to €1,200 for solar water heating as of July 2026. The installer applies on your behalf and you pay the balance after the grant is deducted.
Does my home in Tipperary qualify for a grant?
A home built and occupied before 2021 usually qualifies. Housing across Tipperary varies a lot, so the survey decides rather than the county. A registered installer confirms eligibility during a free survey before anything is committed.
The Other Trades a Tipperary Retrofit Needs
A renewable heating upgrade rarely happens on its own, and the order the work goes in decides what it costs. These are SEAI-registered trades covering Tipperary on our sister sites, each one worth lining up before the heating work starts rather than after.
- While the scaffolding is up Roofers in Tipperary If external wall insulation is going on, the scaffolding is already up and paid for. That is the cheapest time to deal with the roof, and solar panels want a sound roof under them.
- Alongside the installation Plumbers and gas installers in Tipperary Taking out an old oil or gas boiler, reworking the heating circuit and fitting the hot water cylinder is a registered plumber’s job, and a heat pump needs an RGI plumber to commission it.
This Installer Can Process Your SEAI Grant
J.Byrne & Son (Aughrim) LTD is registered with SEAI, which means they can manage your grant application as part of the installation process. The SEAI heat pump grant covers up to €12,500 (as of July 2026) of the installation cost. You pay the net amount after the grant is deducted, and your installer handles the paperwork.