SEAI registered Kildare

Keltic Renewables SEAI Registered Heat Pump Installer in Kildare

Contact: Owen Regan

Grant figures confirmed against SEAI

SEAI-registered Keltic Renewables Serving Kildare and Surrounding Areas

Keltic Renewables is a heat pump installer based in Kildare, covering Naas, Maynooth and homeowners across the county. Keltic Renewables is listed on the SEAI register for heat pump installation and solar thermal (checked July 2026), and you contact the installer directly. Confirm current registration with SEAI before you book.

Based in Kildare, Keltic Renewables serves homeowners across the county including Naas, Newbridge, Maynooth, Celbridge, Leixlip, Athy, Clane, Kilcock, Kildare town and Monasterevin. Whether you are in Naas, Maynooth or anywhere across Kildare, get in touch to discuss your renewable heating project.

Renewable heating upgrades supported by the SEAI grant scheme are open to homeowners right across Kildare, whether you are replacing an ageing oil or gas boiler, adding solar, or planning a full home energy upgrade.

Free · No obligation

Send Keltic Renewables an enquiry

Describe your job once. It goes straight to Keltic Renewables, an SEAI-registered installer in Kildare — no lead-selling, no middleman.

Enquiry sent to Keltic Renewables. They will be in touch directly.
Something went wrong. Please try again, or call the number above.

Keltic Renewables, Common Questions

Is Keltic Renewables SEAI-registered?

Keltic Renewables is listed on the SEAI register for heat pump installation in Kildare (checked July 2026). Registration can change, so confirm it on the SEAI registered contractor search (https://hes.seai.ie/GrantProcess/ContractorSearch.aspx) before you book.

How do I get a quote from Keltic Renewables?

Contact Keltic Renewables directly using the phone number on this page. Nothing goes through us, there is no booking fee, and your details are not passed to anyone else or sold on.

What areas does Keltic Renewables cover?

Keltic Renewables is based in Kildare and takes work across the county, including Naas, Newbridge, Maynooth, Celbridge, Leixlip, Athy, Clane, Kilcock, Kildare town and Monasterevin. Most installers cover their whole county rather than one town, so it is worth confirming your own address when you call.

Should anything be done before the installation?

Insulation comes first on any home energy upgrade. A well-sealed house needs a smaller system and runs at a lower cost, and attic and wall insulation carry SEAI grants of their own. Ask about the fabric of the house when you speak to Keltic Renewables.

What grant can I claim on work by Keltic Renewables?

Grants may be available for eligible homes. SEAI lists support of up to €12,500 for the full heat pump package as of July 2026, and SEAI decides eligibility. Confirm how the application and payment work with Keltic Renewables and with SEAI before any work starts.

Does my home in Kildare qualify for a grant?

A home built and occupied before 2021 usually qualifies. Housing across Kildare varies a lot, so the survey decides rather than the county. A registered installer confirms eligibility during a free survey before anything is committed.

SEAI Heat Pump Grant for Work by Keltic Renewables

SEAI support for a heat pump is up to €12,500 (as of July 2026) for eligible homes. Ask Keltic Renewables how the grant application and payment would work for your job, and confirm the details with SEAI before any work starts.

It is worth knowing how the total breaks down before the survey. The heat pump itself carries €6,500, a Renewable Heat Bonus applies where you are replacing an oil, gas, solid fuel or electric storage system, and a further amount goes towards heating system upgrades such as new radiators. Asking for the quote to set those out separately makes the net figure clear rather than leaving it to be worked out later.