Limerick Solar SEAI Registered Solar Thermal Installer in Kildare
Contact: John Dawson
Grant figures confirmed against SEAI
SEAI-registered Limerick Solar Serving Kildare and Surrounding Areas
Limerick Solar is an SEAI-registered solar thermal installer based in Kildare, covering Naas, Maynooth and homeowners across the county. Registered with SEAI for solar thermal, they can carry out grant-eligible work and process your SEAI grant application directly, so you deal with the installer rather than a middleman.
Based in Kildare, Limerick Solar serves homeowners across the county including Naas, Newbridge, Maynooth, Celbridge, Leixlip, Athy, Clane, Kilcock, Kildare town and Monasterevin. Whether you are in Naas, Maynooth or anywhere across Kildare, get in touch to discuss your renewable heating project.
Renewable heating upgrades supported by the SEAI grant scheme are open to homeowners right across Kildare, whether you are replacing an ageing oil or gas boiler, adding solar, or planning a full home energy upgrade.
Send Limerick Solar an enquiry
Describe your job once. It goes straight to Limerick Solar, an SEAI-registered installer in Kildare — no lead-selling, no middleman.
Limerick Solar, Common Questions
Is Limerick Solar SEAI-registered?
Yes. Limerick Solar appears on the official SEAI registered contractor database for solar thermal installation in Kildare, which is what allows them to carry out grant-eligible installations and process your SEAI grant application.
How do I get a quote from Limerick Solar?
Contact Limerick Solar directly using the phone number on this page. Nothing goes through us, there is no booking fee, and your details are not passed to anyone else or sold on.
What areas does Limerick Solar cover?
Limerick Solar is based in Kildare and takes work across the county, including Naas, Newbridge, Maynooth, Celbridge, Leixlip, Athy, Clane, Kilcock, Kildare town and Monasterevin. Most installers cover their whole county rather than one town, so it is worth confirming your own address when you call.
Does Limerick Solar only do solar thermal installation?
On the SEAI register they are listed for solar thermal installation. They may well do other work, but solar thermal installation is the measure their registration covers, so it is the one they can process a grant for.
Should anything be done before the installation?
Insulation comes first on any home energy upgrade. A well-sealed house needs a smaller system and runs at a lower cost, and attic and wall insulation carry SEAI grants of their own. Ask about the fabric of the house when you speak to Limerick Solar.
What grant can I claim on work by Limerick Solar?
Because they are on the SEAI register, work carried out by Limerick Solar is grant-eligible. SEAI pays up to €1,200 for solar water heating as of July 2026. The installer applies on your behalf and you pay the balance after the grant is deducted.
The Other Trades a Kildare Retrofit Needs
A renewable heating upgrade rarely happens on its own, and the order the work goes in decides what it costs. These are SEAI-registered trades covering Kildare on our sister sites, each one worth lining up before the heating work starts rather than after.
- While the scaffolding is up Roofers in Kildare If external wall insulation is going on, the scaffolding is already up and paid for. That is the cheapest time to deal with the roof, and solar panels want a sound roof under them.
- Alongside the installation Plumbers and gas installers in Kildare Taking out an old oil or gas boiler, reworking the heating circuit and fitting the hot water cylinder is a registered plumber’s job, and a heat pump needs an RGI plumber to commission it.
This Installer Can Process Your SEAI Grant
Limerick Solar is registered with SEAI, which means they can manage your grant application as part of the installation process. The SEAI heat pump grant covers up to €12,500 (as of July 2026) of the installation cost. You pay the net amount after the grant is deducted, and your installer handles the paperwork.