Watts Up Electric SEAI Registered Solar PV Installer in Kerry
Contact: Luke Morrin
Grant figures confirmed against SEAI
SEAI-registered Watts Up Electric Serving Kerry and Surrounding Areas
Watts Up Electric is an SEAI-registered solar PV installer based in Kerry, covering Tralee, Listowel and homeowners across the county. Registered with SEAI for solar pv panels, they can carry out grant-eligible work and process your SEAI grant application directly, so you deal with the installer rather than a middleman.
Based in Kerry, Watts Up Electric serves homeowners across the county including Tralee, Killarney, Listowel, Kenmare, Dingle, Cahersiveen, Killorglin and Castleisland. Whether you are in Tralee, Listowel or anywhere across Kerry, get in touch to discuss your renewable heating project.
Renewable heating upgrades supported by the SEAI grant scheme are open to homeowners right across Kerry, whether you are replacing an ageing oil or gas boiler, adding solar, or planning a full home energy upgrade.
Send Watts Up Electric an enquiry
Describe your job once. It goes straight to Watts Up Electric, an SEAI-registered installer in Kerry — no lead-selling, no middleman.
Watts Up Electric, Common Questions
Is Watts Up Electric SEAI-registered?
Yes. Watts Up Electric appears on the official SEAI registered contractor database for solar PV panel installation in Kerry, which is what allows them to carry out grant-eligible installations and process your SEAI grant application.
How do I get a quote from Watts Up Electric?
Contact Watts Up Electric directly using the phone number on this page. Nothing goes through us, there is no booking fee, and your details are not passed to anyone else or sold on.
What areas does Watts Up Electric cover?
Watts Up Electric is based in Kerry and takes work across the county, including Tralee, Killarney, Listowel, Kenmare, Dingle, Cahersiveen, Killorglin and Castleisland. Most installers cover their whole county rather than one town, so it is worth confirming your own address when you call.
Does Watts Up Electric only do solar PV panel installation?
On the SEAI register they are listed for solar PV panel installation. They may well do other work, but solar PV panel installation is the measure their registration covers, so it is the one they can process a grant for.
Should anything be done before the installation?
Insulation comes first on any home energy upgrade. A well-sealed house needs a smaller system and runs at a lower cost, and attic and wall insulation carry SEAI grants of their own. Ask about the fabric of the house when you speak to Watts Up Electric.
What grant can I claim on work by Watts Up Electric?
Because they are on the SEAI register, work carried out by Watts Up Electric is grant-eligible. SEAI pays up to €1,800 for solar panels as of July 2026. The installer applies on your behalf and you pay the balance after the grant is deducted.
The Other Trades a Kerry Retrofit Needs
A renewable heating upgrade rarely happens on its own, and the order the work goes in decides what it costs. These are SEAI-registered trades covering Kerry on our sister sites, each one worth lining up before the heating work starts rather than after.
- While the scaffolding is up Roofers in Kerry If external wall insulation is going on, the scaffolding is already up and paid for. That is the cheapest time to deal with the roof, and solar panels want a sound roof under them.
- Alongside the installation Electricians in Kerry A heat pump needs its own supply and isolator, and solar panels need the inverter tied into the consumer unit and the ESB notification handled. Both are electrician work.
This Installer Can Process Your SEAI Grant
Watts Up Electric is registered with SEAI, which means they can manage your grant application as part of the installation process. The SEAI heat pump grant covers up to €12,500 (as of July 2026) of the installation cost. You pay the net amount after the grant is deducted, and your installer handles the paperwork.